Waste

We are changing our manufacturing to halve the amount of operational waste we generate by 2020 and are shifting perceptions to see waste as a potential resource.

Over 70% of GSK sites achieve zero waste to landfill

In 2010 some 17,200 tonnes of waste were being sent to landfill each year.  So, a target was set: to achieve zero waste to landfill at all our sites by 2020. Today, over 70% of GSK sites and offices have now achieved zero waste to landfill.

Seeing waste as a resource 

Instead of waste streams going to landfill, they are being seen as a resource and diverted to other uses.  This is because, as well as environmental benefits, there are considerable economic and social benefits to be gained, too.

Our waste targets 

With a goal to halve operational waste by 2020, we are actively eliminating, reusing and recycling waste, as well as generating energy from waste. We continue to make progress towards our 2020 commitment, cutting our operational waste (hazardous and non-hazardous) by 25% over the last five years. Our investment in infrastructure and technology has yielded results.  In 2016, we produced 137,000 tonnes of waste, 4% less than the previous year. The majority of this (73%) was recycled or incinerated to recover energy, with only 5% sent to landfill.